NAVSEA 10 Day Fiber Optic Installer/QA (California)

Includes all modules outlined for the Fiber Optic Technician. This course is 80-hours or 10 days, 8-hour days of training. Course includes Core, Cable Handling, Forming, Blown Optical Fiber, Single Ferrule (SF), Multi Terminus (MT), Fusion Splicing, Optical Testing, and Quality Assurance (QA).

10 Days
Mark Myland, Joseph Rivadeneyra

2 weeks, 07:30 AM PDT - 04:30 PM PDT

KITCO Fiber Optics - CA
  • 2500 Hoover Avenue
  • Suite J
  • National City, CA
  • CA
  • 91950
  • United States
Presented by Mark Myland

2 weeks, 07:30 AM PDT - 04:30 PM PDT

KITCO Fiber Optics - CA
  • 2500 Hoover Avenue
  • Suite J
  • National City, CA
  • CA
  • 91950
  • United States
Presented by Joseph Rivadeneyra

2 weeks, 07:30 AM PDT - 04:30 PM PDT

KITCO Fiber Optics - CA
  • 2500 Hoover Avenue
  • Suite J
  • National City, CA
  • CA
  • 91950
  • United States
Presented by Mark Myland

2 weeks, 07:30 AM PDT - 04:30 PM PDT

KITCO Fiber Optics - CA
  • 2500 Hoover Avenue
  • Suite J
  • National City, CA
  • CA
  • 91950
  • United States
Presented by Mark Myland

    2 weeks, 07:30 AM PST - 04:30 PM PST

    KITCO Fiber Optics - CA
    • 2500 Hoover Avenue
    • Suite J
    • National City, CA
    • CA
    • 91950
    • United States
    Presented by Mark Myland

    Description

    ā€¢ 5.2.3.1 CORE Module Includes: Theory and Safety 

    ā€¢ 5.2.3.2 Blown Optical Fiber (BOF) Module Includes: Tube Furcation, Cable Splicing, BOF Testing, Forming, Shaping and Routing 

    ā€¢ 5.2.3.3 Cable Handling, Penetration, and Repair/Mod Module  Includes: Conventional and BOF Cable Handling, Penetration and Repair

    ā€¢ 5.2.3.4 FOICB/TRB Forming, Routing, Shaping Module Includes: Forming, Routing and Shaping in an FOICB/ TRB and Cable End Sealing 

    ā€¢ 5.2.3.5 Fiber Optic Termination ā€“ Single Terminus (Light Duty) Module  Includes: SF Connector Inspection and Cleaning, SF Connector Termination

    ā€¢ 5.2.3.6 Fiber Optic Termination ā€“ Multi-Terminus (Heavy Duty) Module Includes: MT- Connector Termination, Inspection and Cleaning

    ā€¢ 5.2.3.7 Fiber Optic Termination - Fusion Splicing Module Includes: Fusion Splicing and Preparation and Attachment into a Splice Tray

    ā€¢ 5.2.3.8 Optical Testing Module Includes: Inspection and Cleaning, Link Loss, Optical Return Loss, Continuity, MQJ Selection, & Attenuation Testing