M29504/04 and M29504/05, ARINC 801 Insertion Tool (metal) (0721-1120)
includes insertion tool
Showing 1–12 of 16 resultsSorted by popularity
includes insertion tool
This kit contains the following: 0701-3820 Straight Insertion Tool 0701-3850 Extraction Tool 0701- 3901 ASIRT (Alignment Sleeve Insertion/Extraction Tool)
This precision tool will allow the careful removal or installation of M29504/15 alignment sleeves from M28876 multichannel connector nests. The extraction mechanism will remove the alignment sleeve, yet leaves the termini and fiber undamaged. NAVSEA listed and approved for MIL-STD-2042C applications.
Use the 0701-3850 for extraction of M29504/14 and M29504/15 termini from the nest without dam- aging the termini and endface. This tool is also used to remove the ceramic termini from the 0701- 4100 polishing fixture. NAVSEA listed and approved for MIL-STD-2042C applications.
Use the 0701-3820 for installation of M29504/14 and M29504/15 termini into straight, 45°, and 90° backshell connectors. NAVSEA listed and approved for MIL-STD-2042C applications.
Use the 0701-3810 for installation of M29504/14 and M29504/15 termini into straight, 45°, and 90° backshell connectors. NAVSEA listed and approved for MIL-STD-2042C applications.
Use the 0701-3055 tool for the installation of the Aptiv split backshell onto an M28876 connector. This tool is set to 4 inch pounds to ensure proper torque
Use this C-type backshell spanner wrench to torque the backshell and secure the 4, 8, and 31-channel connectors. A properly torqued backshell will ensure lower dB loss in multichannel connectors. NAVSEA listed and approved for MIL-STD-2042C applications.
Use this C-type backshell spanner wrench to torque the backshell and secure the 4, 8, and 31-channel connectors. A properly torqued backshell will ensure lower dB loss in multichannel connectors. NAVSEA listed and approved for MIL-STD-2042C applications.
The 0701-3060 strap wrench is used to torque the M28876 backshell to the proper level as outlined in the MIL- STD-2042C. Used in conjunction with the 0701-3050 torque wrench and/or the 0701-3520 spanner wrench. Note: Two 0701-3060 strap wrenches are required for backshell size 23 applications. NAVSEA listed and approved for MIL-STD-2042C applications.
Install O-Rings without breaking by using the O-Ring installation tools. Select the appropriate tool to secure the correct sized O-Ring. NAVSEA listed and approved for MIL-STD-2042C applications.
uses Accessibility Checker to monitor our website's accessibility.
Please contact our training department directly at (866) 643-5220
Or email us at:
[email protected]
[email protected]
Sorry for the inconvenience.
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/
Please join KITCO at Booth No. 944 at Modern Day Marine Apr 30th – May 2nd, 2024
To book an appointment with our on-site experts please contact [email protected] or [email protected]
KITCO will be at AFCEA West 2024 in San Diego Feb 13th, 2024! Our subject matter experts will be on duty and we will demonstrating our latest technology.
Please come by or make an appointment to visit our team at booth number 2334
Obsolete – Upgrades – Excess Inventory
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/
WidgCo BackPack and KSE Kit TFOCA II®
WidgCo BackPack and KSE Kit Expanded Beam
Portable OTDR, Cleaning and Inspection Backpack Kit
Pigtail Consumable Replacement Kit
Universal Splice Kit and Termination/Fusion Splice Kit
Military/Commercial Termination Kit
Military/Commercial Inspection, Cleaning, and Test Kit
Our in-house trained and certified pool of technicians are secret-cleared and able to travel to all locations. We execute this work through teaming agreements with prime contractors, shipyards or direct government contracts. We have program management expertise and are in compliance with government accounting standards.
Incorporate all Changes
Lock Configuration
Management Control all Documents
Full Rate Production Checklist
Verify Against Contract Requirements
Verify Product Checklist
Changes Needed?
Revise or Proceed
Team Review/Authorization
Build First Article for Customer Acceptance
Production to complete Acceptance
First Article Testing
Testing Satisfactory
Customer Authorization to proceed to Production
Team Assignments
Design Plan Developed
Engineering Testing
Production Checklist Created
Team Review/Authorization
Build Prototype via design specs
Prototype Checklist
Team Review/Authorization
Identify Needs
Gather Inputs
Create Checklist
Review Authorize
Get a LIVE demonstration of our Quad EL Ground Tactical Fusion Splice Kit and register to win a FREE Nintendo Switch!
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/